It’s the best way I found to commemorate my first solo flight
GTU Airport Map, Georgetown Executive Airport At Johnny Gantt Field Print - White / Black Frame / 8"x10" is backordered and will ship as soon as it is back in stock.
This detailed map of Georgetown Executive Airport At Johnny Gantt Field (GTU) located in Georgetown, Texas showcases its runways, taxiways, hangars, buildings, and terminals. Each runway and taxiway is labeled, and the airport's geographical and radio frequency information are included.
Information included on this map:
- Runways, Taxiways, Terminals, Hangars, and other Airport Buildings
- Airport Elevation
- Airport Location
- Airport Activation Date
- # of Runways
- ARTCC
- Available Radio Frequencies
We offer free shipping on all US orders! All orders are shipped from our fulfillment centers via UPS or Fedex. International orders (Canada and Mexico) may incur additional taxes/duties upon delivery which are not covered. If your order needs to go out with a specific courier, please alert us before ordering.
While fulfillment times can vary, it typically takes 3-5 business days for your order to print and ship (weekends and holidays not included). After your order is shipped, standard delivery ranges from 3-7 days, with most customers receiving their print between 8-12 days. We allow up to 15 days to deliver, but please note that sometimes this window can shift due to unexpected delays caused by inclement weather.
Often times a print can get lost or misplaced in transit by our couriers. If a print goes more than 10 days without a tracking or delivery update (and given that the address provided was correct) we'll send a priority replacement.
If your order is marked as delivered and you did not receive the order, you must file a claim with the courier. Often times Fedex or UPS is able to track down the missing package. Other times we are able to provide a replacement if the courier admits fault. These are handled on a case by case basis. Unfortunately, we are not able to cover or replace items stolen after they are marked as delivered.
If the address provided was incorrect or failed to deliver at the provided address resulting in your order being returned to us, we must wait until the order is returned at which point we can update your delivery address and send the order back out. Please note that return shipments are deprioritized and may take much longer to get back to our fulfillment centers.
Each of our prints and canvases is made custom to order, so we’re unable to accept returns or provide replacements for misorders, incorrect sizes, or changes of heart. If your print arrives damaged in any way from shipping, please send clear photos of the damage within 30 days of delivery, and we’ll be happy to ship you a priority replacement! We’re unable to provide replacements due to damage past our 30-day damage report window, so make sure to open your order and check it upon delivery!
If you'd like to change or cancel your order, please contact us immediately. We try to get orders out as quickly as possible, and are unable to change or cancel orders once they've gone to print. If you need to change your address, please also contact us immediately, as we are unable to change the address once the package has been shipped.
All giclée prints come printed on an artist-grade archival matte paper with a heavy paper thickness of 9.5 mil. They are archival-grade and acid-free to ensure a longer print life compared to standard options.
High-quality frames are created from a durable wooden core and comes in two modern color options - black and natural wood. Standard framed pieces are 0.875" thick and .875" in depth. All frames come with gallery-quality acrylic. For easy mounting, every frame includes a pre-installed sawtooth hangar on the back.
Unframed prints are available and come securely rolled in a durable cardboard tube.
The size of your selection is the size of your print design.
Framed prints are 1.3" bigger than the size selection on their width and height (ex. 16" x 20" = 17.3" x 21.36" in frame).
Available Print Sizes:
8"x10"
12"x15"
16"x20"
24"x30"
GTU Airport Map, Georgetown Executive Airport At Johnny Gantt Field Print - White / Black Frame / 8"x10" is backordered and will ship as soon as it is back in stock.
Georgetown Executive Airport At Johnny Gantt Field